Practical guide
Safety reminders
ECOFASS DRUMS ARE A PRESSURIZED PRODUCT, SO HANDLE WITH CARE!
For this reason, it is not recommended to throw it away or roll it
Max. operating pressure: 3 bar
- do not store an empty drum under pressure; depressurize it immediately upon return
- recommended barrel storage temperature between 0° and 25°C
- store bags in a clean, dry place – recommended bag storage temperature > 10°C
- filling heads used for kegging and filling heads must be in excellent condition
to guarantee a perfect seal when connected.
Please read the following instructions carefully before using Ecofass drums. If you have any questions, please do not hesitate to contact us. A filling demonstration is available on our main website.
Preparation - Upside down filling imperative
INSERTING THE BAG INTO THE BARREL :
- Check that the seal between the head and neck of the barrel is correctly positioned
- Remove the elastic bands from the pocket
- Carefully insert the pouch into the barrel, taking care not to damage or pierce the pouch with the inside edge of the barrel neck.
- Tighten the retaining nut to a torque of 50 Nm using the clamping bell.
- Spray disinfectant on the head
Loose nut = Air leak at barrel head
= Back pressure loss
The barrel is ready for filling!
Use the turner for filling
Use the filling head for filling
1 – ELIMINATE RESIDUAL AIR IN THE BAG
- Connect the disinfected filling head
- Apply 0.8 bar pressure between drum and bag via the filling head’s gas inlet
- Open the valve corresponding to the inside of the bag (filling head liquid inlet).
- Close the valve and maintain counterpressure in the barrel
- Remove filling head
2 – PREPARATION FOR FILLING
- Connect the filling head to the pump, disinfected beforehand (max. filling pump outlet pressure 2.5 bar).
- Fill the pipe with the product to be burned until there are no more air bubbles.
- Close valve
3 – FILLING OF THE DRUM
- Connect the disinfected filling head
- Turn the barrel upside down
- Open fluid inlet valve
- Adjust air-side exhaust to maintain a constant back pressure of 0.8 bar*.
*General value, to be adjusted according to your means and filling conditions.
4 – MAKE SURE YOU FILL THE DRUM CORRECTLY
- The recommended filling time is between 2 and 5 minutes* – not more than 5 minutes and not less than 2 minutes*.
- Do not put 20L into a 30L barrel
- When the required volume (or weight) has been reached, i.e. when the back pressure has dropped to 0 bar, close the product inlet valve.
*General value, to be adjusted according to your means and filling conditions.
5 – FINALIZING FILLING
- Close air-side exhaust
- Apply a back pressure of 2.5 bar
- Turning the barrel right side up
- Disconnect filling head
- Rinse head and barrel with plenty of water
- Dry the head with filtered air II using a blowgun
- Spray disinfectant on the head
- Apply a tamper-evident cap to the head
Safety reminders
THE FUT IN RETURN IS UNDER PRESSURE:
Imperative: Depressurize the drum before dismantling: tap the filling head to release the compressed air (orCO2) on the air side.
In special cases, if you are unable to depressurize the keg, it may be that the head gasket is still stuck, giving the impression that there is no pressure in the keg.
In this case, press the filling head handle several times. If the seal remains stuck, apply pressure on the air side; this will loosen the seal and allow the pressure to escape.